Close Menu
Canadian ReviewsCanadian Reviews
  • What’s On
  • Reviews
  • Digital World
  • Lifestyle
  • Travel
  • Trending
  • Web Stories
Trending Now
Cast, Plot, & Runtime Details

Cast, Plot, & Runtime Details

Nancy Guthrie disappearance: Day 82 latest updates

Nancy Guthrie disappearance: Day 82 latest updates

How bad is the devaluation? When rewards programs change, the truth is in the details | Canada Voices

How bad is the devaluation? When rewards programs change, the truth is in the details | Canada Voices

Youth pleads not guilty to terrorism charges

Youth pleads not guilty to terrorism charges

Vancouver’s container market soon kicks off with 30+ new vendors and a waterfront bar

Vancouver’s container market soon kicks off with 30+ new vendors and a waterfront bar

Live Nation is releasing  tickets to 300+ concerts across Canada

Live Nation is releasing $30 tickets to 300+ concerts across Canada

Inside Microsoft’s wave of executive departures

Inside Microsoft’s wave of executive departures

Facebook X (Twitter) Instagram
  • Privacy
  • Terms
  • Advertise
  • Contact us
Facebook X (Twitter) Instagram Pinterest Vimeo
Canadian ReviewsCanadian Reviews
  • What’s On
  • Reviews
  • Digital World
  • Lifestyle
  • Travel
  • Trending
  • Web Stories
Newsletter
Canadian ReviewsCanadian Reviews
You are at:Home » Artemis II: NASA targets Feb. 19 for second moon mission fueling rehearsal
Artemis II: NASA targets Feb. 19 for second moon mission fueling rehearsal
Lifestyle

Artemis II: NASA targets Feb. 19 for second moon mission fueling rehearsal

16 February 20264 Mins Read

NASA to hold Artemis II fueling rehearsal on Thursday

NASA plans to conduct a second wet dress rehearsal for Artemis II at NASA’s Kennedy Space Center. The nearly 50-hour countdown will begin at 6:40 p.m. EST on Feb. 17, leading to a simulated launch window opening at 8:30 p.m. Feb. 19.

ORLANDO, Fla. – NASA is preparing for a critical fueling test this week as it moves closer to launching its Artemis II mission around the moon. 

The agency has set Thursday, Feb. 19, as the target for a second wet dress rehearsal of its deep space rocket.

What we know:

NASA plans to conduct the second wet dress rehearsal for Artemis II at NASA’s Kennedy Space Center. The nearly 50-hour countdown will begin at 6:40 p.m. EST on Feb. 17, leading to a simulated launch window opening at 8:30 p.m. Feb. 19.

The rehearsal will include loading super-cold liquid hydrogen and liquid oxygen into the Space Launch System rocket, running a full countdown, practicing a recycled countdown clock and draining the tanks. Teams also will simulate scrub scenarios.

fILE – This image shows NASA’s SLS (Space Launch System) and Orion spacecraft rolling out of the Vehicle Assembly Building at NASA’s Kennedy Space Center. NASA’s massive crawler-transporter, upgraded for the Artemis program, carries the powerful SLS

Over the weekend, engineers replaced a filter in ground support equipment suspected of restricting the flow of liquid hydrogen during a partial fueling test on Feb. 12. Officials said enough data was gathered during that earlier test to proceed with another full rehearsal.

CLICK TO DOWNLOAD THE FOX LOCAL APP

Although the Artemis II astronauts will not participate, ground teams will practice Orion spacecraft closeout procedures, including hatch operations.

What we don’t know:

NASA has not set an official launch date for Artemis II. Agency managers say a formal date will come only after the wet dress rehearsal is successfully completed, and data reviews are finalized.

While March 6 is currently identified as the earliest possible launch opportunity, that date depends on a successful test, adequate time for analysis and preparing the rocket and launch pad for flight.

It also remains unclear whether additional technical issues could emerge during fueling, particularly after the earlier hydrogen flow concern.

Timeline:

The countdown for the second wet dress rehearsal begins on Feb. 17. During the rehearsal, launch controllers will conduct two practice runs of the final 10 minutes of countdown, known as terminal count.

Operators will pause at T-minus 1 minute, 30 seconds, resume to T-minus 33 seconds, recycle the clock to T-minus 10 minutes and then conduct a second terminal count to just inside T-minus 30 seconds before ending the simulation.

If all goes well, the earliest launch opportunity would be March 6.

Big picture view:

Artemis II is the first crewed test flight of NASA’s Artemis program, which aims to return astronauts to the moon for the first time since the Apollo era and lay groundwork for future missions to Mars.

SIGN-UP FOR FOX 35’S BREAKING NEWS, DAILY NEWS NEWSLETTERS

The wet dress rehearsal is one of the final major milestones before flight, designed to simulate real-world launch conditions, including the possibility of weather or technical scrubs. The test allows engineers and launch teams to identify and fix issues before astronauts are aboard.

What they’re saying:

NASA said teams replaced a filter that was “suspected of reducing the flow of liquid hydrogen” during the earlier fueling attempt and have “reconnected the line with the new filter and are reestablishing proper environmental conditions.”

The agency said managers have determined “March 6 is the earliest opportunity for launch” that allows time for a second wet dress rehearsal, data review and transition to launch operations.

NASA also said it will provide live coverage of the rehearsal, including a separate camera feed during fueling, and continue updates through its Artemis blog.

The Source: This story was written based on information shared by NASA.

 

NewsInstastoriesSpace

Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email

Related Articles

Nancy Guthrie disappearance: Day 82 latest updates

Nancy Guthrie disappearance: Day 82 latest updates

Lifestyle 23 April 2026
How bad is the devaluation? When rewards programs change, the truth is in the details | Canada Voices

How bad is the devaluation? When rewards programs change, the truth is in the details | Canada Voices

Lifestyle 23 April 2026
Youth pleads not guilty to terrorism charges

Youth pleads not guilty to terrorism charges

Lifestyle 23 April 2026
Doomsday’s Doctor Doom feels like a classic manga villain

Doomsday’s Doctor Doom feels like a classic manga villain

Lifestyle 23 April 2026

1989 Hit Film Ranked Among ‘Best Movies of All Time’

Lifestyle 23 April 2026
23rd Apr: Yiya Murano: Death at Tea Time (2026), 1hr 44m [TV-MA] (6/10)

23rd Apr: Yiya Murano: Death at Tea Time (2026), 1hr 44m [TV-MA] (6/10)

Lifestyle 23 April 2026
Top Articles
9 Longest-Lasting Nail Polishes, Tested by Top Manicurists

9 Longest-Lasting Nail Polishes, Tested by Top Manicurists

25 January 2026179 Views
The Mother May I Story – Chickpea Edition

The Mother May I Story – Chickpea Edition

18 May 202497 Views
How to Keep Your Business Finances Organized All Year Round

How to Keep Your Business Finances Organized All Year Round

3 October 202585 Views
LearnToTrade: A Comprehensive Look at the Controversial Trading School

LearnToTrade: A Comprehensive Look at the Controversial Trading School

28 April 202476 Views
Demo
Don't Miss
Live Nation is releasing  tickets to 300+ concerts across Canada
What's On 23 April 2026

Live Nation is releasing $30 tickets to 300+ concerts across Canada

Summer of Live, presented by Live Nation, is back this year, offering $30 tickets to…

Inside Microsoft’s wave of executive departures

Inside Microsoft’s wave of executive departures

Doomsday’s Doctor Doom feels like a classic manga villain

Doomsday’s Doctor Doom feels like a classic manga villain

1989 Hit Film Ranked Among ‘Best Movies of All Time’

About Us
About Us

Canadian Reviews is your one-stop website for the latest Canadian trends and things to do, follow us now to get the news that matters to you.

Facebook X (Twitter) Pinterest YouTube WhatsApp
Our Picks
Cast, Plot, & Runtime Details

Cast, Plot, & Runtime Details

Nancy Guthrie disappearance: Day 82 latest updates

Nancy Guthrie disappearance: Day 82 latest updates

How bad is the devaluation? When rewards programs change, the truth is in the details | Canada Voices

How bad is the devaluation? When rewards programs change, the truth is in the details | Canada Voices

Most Popular
Why You Should Consider Investing with IC Markets

Why You Should Consider Investing with IC Markets

28 April 202429 Views
OANDA Review – Low costs and no deposit requirements

OANDA Review – Low costs and no deposit requirements

28 April 2024362 Views
LearnToTrade: A Comprehensive Look at the Controversial Trading School

LearnToTrade: A Comprehensive Look at the Controversial Trading School

28 April 202476 Views
© 2026 ThemeSphere. Designed by ThemeSphere.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact us

Type above and press Enter to search. Press Esc to cancel.