Close Menu
Canadian ReviewsCanadian Reviews
  • What’s On
  • Reviews
  • Digital World
  • Lifestyle
  • Travel
  • Trending
  • Web Stories
Trending Now

If Your Child Is Losing Confidence, Dr. Becky Says This Is What To Do

Netflix Sets October 2026 Release Date and Drops First Trailer for ‘Dead-End Job’

30th Sep: The Arena (2026), 9 Episodes [TV-MA] (5.6/10)

Hydro-Québec to face off against industry actors like Google in data centre hearing

In the news today: pipeline announcement, minimum wage hikes, Canadian goes to space

Formula and How to Improve Average Daily Rate

5 Xbox Games Releasing In October You Officially Can’t Miss

Facebook X (Twitter) Instagram
  • Privacy
  • Terms
  • Advertise
  • Contact us
Facebook X (Twitter) Instagram Pinterest Vimeo
Canadian ReviewsCanadian Reviews
  • What’s On
  • Reviews
  • Digital World
  • Lifestyle
  • Travel
  • Trending
  • Web Stories
Newsletter
Canadian ReviewsCanadian Reviews
You are at:Home » Hydro-Québec to face off against industry actors like Google in data centre hearing
Lifestyle

Hydro-Québec to face off against industry actors like Google in data centre hearing

1 October 20262 Mins Read

A Hydro-Québec proposal that could double the cost of energy for data centres is being put to the test at a public hearing.

The hearing in Montreal will pit tech industry actors like Google against the provincial utility.

Hydro-Québec is asking the Régie de l’énergie, the provincial energy regulator, to consider a new electricity rate for data centres that require a capacity of over five megawatts.

The proposal would raise energy prices to an average of 13 cents per kilowatt hour.

The utility says this is around twice as much as what data centres pay as large‑power customers.

The hearing is scheduled to last until Oct. 9 and will involve actors from several industries, including the Canadian Federation of Independent Business.

Hydro-Québec says that higher rates for the sector could limit the impacts of growing data centre energy demand on residential rates.

Energy costs for data centres in Quebec are currently around six cents per kWh, which is much lower than in most other jurisdictions, said energy analyst Jean-François Blain.

“It creates an exceptional draw that benefits Quebec, as long as they can supply those companies,” he said.

With energy demand and costs increasing, Blain said Hydro-Québec might not be able to afford giving data centres the same advantageous price for long. The new rate would bring their rates closer to those of other areas.

Hydro-Québec said data centres that would be subject to the new rate currently consume 190 MW at peak consumption and could reach 1,000 MW by 2035.

The provincial energy regulator will be reviewing whether a new rate for data centres is fair and sustainable.

This report by The Canadian Press was first published Oct. 1, 2026.

By Marieke Glorieux-Stryckman | Copyright 2026, The Canadian Press. All rights reserved.

Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email

Related Articles

If Your Child Is Losing Confidence, Dr. Becky Says This Is What To Do

Lifestyle 1 October 2026

30th Sep: The Arena (2026), 9 Episodes [TV-MA] (5.6/10)

Lifestyle 1 October 2026

In the news today: pipeline announcement, minimum wage hikes, Canadian goes to space

Lifestyle 1 October 2026

5 Xbox Games Releasing In October You Officially Can’t Miss

Lifestyle 1 October 2026

Amazon’s 3-Tier Nightstand with a ‘Convenient’ Charging Station Is Just $28 Before Prime Day

Lifestyle 1 October 2026

30th Sep: The Widower: 'Til Death Do Us Part (2026), 1hr 31m [TV-MA] (6/10)

Lifestyle 1 October 2026
Top Articles
Why Should a Couple in Love Visit an Escape Room?

Why Should a Couple in Love Visit an Escape Room?

30 September 2025127 Views
The Mother May I Story – Chickpea Edition

The Mother May I Story – Chickpea Edition

18 May 2024104 Views
How to Keep Your Business Finances Organized All Year Round

How to Keep Your Business Finances Organized All Year Round

3 October 202596 Views
LearnToTrade: A Comprehensive Look at the Controversial Trading School

LearnToTrade: A Comprehensive Look at the Controversial Trading School

28 April 202481 Views
Demo
Don't Miss
Travel 1 October 2026

Formula and How to Improve Average Daily Rate

In Brief: Daniel Foreman outlines the formula for calculating hotel average daily rate (ADR) and…

5 Xbox Games Releasing In October You Officially Can’t Miss

Amazon’s 3-Tier Nightstand with a ‘Convenient’ Charging Station Is Just $28 Before Prime Day

30th Sep: The Widower: 'Til Death Do Us Part (2026), 1hr 31m [TV-MA] (6/10)

About Us
About Us

Canadian Reviews is your one-stop website for the latest Canadian trends and things to do, follow us now to get the news that matters to you.

Facebook X (Twitter) Pinterest YouTube WhatsApp
Our Picks

If Your Child Is Losing Confidence, Dr. Becky Says This Is What To Do

Netflix Sets October 2026 Release Date and Drops First Trailer for ‘Dead-End Job’

30th Sep: The Arena (2026), 9 Episodes [TV-MA] (5.6/10)

Most Popular
Why You Should Consider Investing with IC Markets

Why You Should Consider Investing with IC Markets

28 April 202433 Views
OANDA Review – Low costs and no deposit requirements

OANDA Review – Low costs and no deposit requirements

28 April 2024369 Views
LearnToTrade: A Comprehensive Look at the Controversial Trading School

LearnToTrade: A Comprehensive Look at the Controversial Trading School

28 April 202481 Views
© 2026 ThemeSphere. Designed by ThemeSphere.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact us

Type above and press Enter to search. Press Esc to cancel.